Search results
Viewing results from „441 to 450” of 485 results total
OHB prime contractor for development and assembly of the LEO-PNT navigation demonstration satellites
for the mission is quite ambitious by space flight standards: OHB’s four demonstrator satellites
OHB selected by MDA Space as part of MDA AURORA supply chain
since day one. For those who dream big and push boundaries on the ground and in the stars to change
Galileo FOC satellites Danielè and Alizée successfully launched
says: “Following the successful initialisation, a stable connection with the two satellites has been
Partnership between OHB and Fraunhofer IPA
professionally. Standardized processes after each use preserve the purity and viability of CAPE® even after
Small but packs a punch Flexible clean-room mini cover µCAPE® offers temporary protection for high ISO-class clean-room facilities
together with OHB’s partner Fraunhofer IPA in Stuttgart. After lengthy measurements of materials, a stable
Antwerp Space selected to develop the communications subsystem for Ariel
to the environment in which it is formed and the star around which it is orbiting. At the same time
OHB System AG awarded contract for the development phase of the Copernicus Sentinel-2 Next Generation
-edge technologies such as highly stable ceramics and free-form optics so that the instruments can
EnMAP: The data specialists

to train staff at public authorities, for example in the environmental departments. This can be useful when
Four Galileo FOC satellites successfully launched all at once
for Institutional Space Programs says: “Following the successful initialization, a stable connection
Up close: OHB camera system filming OneWeb satellites in space
again relying on OHB System AG’s proven OCAM-2 system. Four cameras mounted to the Fregat upper stage