Search results
Viewing results from „71 to 80” of 115 results total
OHB SE exhibiting at ILA in Berlin
and international space projects. OHB’s portfolio includes such elements as access to space, navigation, Earth[...] services. Career Center with interactive elements The OHB Group will also be present at Career Center[...] interactive elements highlighting careers in the aviation and space...
Successfully passed: First important test for OHB's EDRS-C satellite
encryption electronics have been installed. The dedicated EDRS-C satellite is fitted with a data relay
National Heinrich Hertz satellite communications mission: OHB orders satellite payload from Tesat
a modular structure permitting different configurations including solely electric satellite propulsion
MT Aerospace AG commissioned to deliver Tank Systems for European Mars-Mission ERO
AG for the European ERO is the 900-liter L-XTA Xenon tank. It will supply the spacecraft's highly efficient electric
Europe’s weather satellites MTG taking shape
, France, where further components (such as light-sensitive detectors, electronics and the necessary
Instrument for German environmental satellite EnMAP performing well in test campaign
?) and an EMC test (Are requirements with respect to electromagnetic compatibility satisfied?). Following
MT Aerospace and ArianeGroup sign prototype development contract for optimized Ariane 6 upper stage
engine and the various fluidic, hydraulic and electronic monitoring and control systems, this system also
Fly me to the Moon!
solar-electric propulsion for Earth-Moon transfer and lunar orbit capture. “The Moon has always been
OHB awarded a study for 3D Printing on the moon
of elements of different scales will be investigated for their potential to be 3D printed. The other survey[...] is to use or reuse, a maximum of elements needed for inhabiting a future lunar station. In this respect, the material
OHB flagship project Galileo celebrating its 10th anniversary: January 7, 2010 marked the start of Europe’s first satellite navigation system
, one satellite will be completed every five to six weeks at eleven production islands. Following FM23, OHB[...] is producing a further eleven satellites for Galileo Batch 3. Various satellite designs and mission concepts